Wednesday, January 21, 2009

House projects

Another household project is underway. It has been going on for over a week now. Back in November, the ceiling tiles in the dining room started to bow. My husband came home on a dinner break and saw the sagging ceiling. He decided to pull the sagging tiles down. The next morning when I walked into the dining room, I saw the missing ceiling tiles. While I was standing there, a couple of ceiling tiles fell to the floor. Later that week, my husband pulled down all of the ceiling tiles.

Before Christmas my husband called some contractors to get estimates on the ceiling. They were really high, so he decided to redo the ceiling himself. Last week, he put up three sheets of the drywall with a lift and hammered away. Then came the joint compound. Then the sanding and the dust it caused. White powder from the sanding got all over the furniture, chairs and floor. Yesterday he sanded the entire ceiling to get it ready to paint. The room was onced again covered with white dust. I walked through the room and left white footprints everywhere.

Last night, he put the first coat of primer on. He hopes to put the second on today, but I don't think he will have time before going to work. This whole process is taking quite a while and he doing it himself. Saving money in the process. I told him the ceiling looked really good. But I can't wait until the room is done. I don't enjoy the walking around the maze that is my dining room. I want to be able to walk into the dining room and enter another room without bumping into furniture.

I'm really going to freak on the next big house project. My husband will be redoing the bathroom in the coming months. He has to gut the entire room. He said it will take some time to do, maybe five days if it all goes well. If it all goes well?! Five days without a shower in the house! I can't live without a shower. I think I see a hotel room in my future.

No comments: